| Vertical |
1,713 metres |
|
5,620 feet |
|
|
| Elevations |
|
| Lift Top Elevation |
2,225 metres |
| (The Stoke Chair) |
7,300 feet |
| Bottom Elevation |
512 metres |
| (Nelsen Lodge) |
1,680 feet |
| Sub Peak Elevation |
2,340 metres |
|
7,677 feet |
| Mt. Mackenzie Summit |
2,466 metres |
|
8,058 feet |
|
|
| Terrain |
|
| Terrain Breakdown |
1,214 hectares |
|
3,031 acres |
|
7% beginner |
|
45.5% intermediate |
|
47.5% advanced |
| Runs |
52 |
| Longest Run |
15.2 km |
| (The Last Spike) |
9.5 miles |
| Gladed Terrain |
13 areas |
| Bowls |
5 bowls (2 in-bounds, 3 in cat ski terrain) |
|
|
| Lifts |
|
| Revelation Gondola |
8 passenger Leitner-Poma high speed gondola |
|
Travels 1,081 vertical metres / 3,547 vertical feet |
| The Stoke |
4 passenger Leitner-Poma high speed chairlift |
|
Travels 632 vertical metres / 2,073 vertical feet |
| The Ripper |
4 passenger Leitner-Poma high speed chairlift |
|
Travels 500 vertical metres / 1,640 vertical feet |
| Little Bit |
Magic Carpet conveyor lift, located outside the |
|
Mid-Mountain Lodge |
|
|
| Historical Snowfall* |
12-18 metres |
|
40-60 feet |
|
*Measured in the Selkirk Mountains |
| Opening Day |
November 28, 2009
|
| Closing Day |
April 11, 2010 |